Our SAR SENAPATI SANTAJI GHORPADE SUGAR FACTORY LTD Belewadi-Kalamma Tal: Kagal, Dist: Kolhapur 22 MW Bagasse based Co-Gen Plant commissioned on dated 06/12/2014. After in house consumption surplus electricity is exported in the state Electricity Grid through a nearby 220KV substation, through a dedicated transmission line of 4 KM length.
Bagasse Based | Season | off Season |
---|---|---|
In House Consumption | 5.89 MW | 2.38 MW |
Exportable Surplus | 15.51 MW | 19.62 MW |
De-Mineralization –RO/UF. Capacity: 25 M3 per Hour-1 No
All plant operation are monitored and controlled by a modern Distribution controlling System (DCS)& PLC, DCS Make Schneider .